• +218 91 052 6312
  • m.turki@alqutob.ly
  • Alburj Str, Hai Alandlus, Tripoli, Libya

Our Projects

  1. SUPERVISOR OF THE INVESTIGATION STUDY FOR THE BALLAST ROCKS FOR RAILWAY (TRIPOLI– MISURATA–SERT – SEBHA AND FROM SERT TO BENGAZI TO TUBRUK – MISAEED) WITH MERIT ENGINEERING OFFICE AS JOINT VENTURE WITH INDUSTRIAL RESEARCH CENTER (IRCE) AT .2002.
  2. SUPERVISOR OF THE GEOTECHNICAL STUDY FOR TRIPOLI RAILWAY STATION WITH MERIT ENGINEERING OFFICE AS JOINT VENTURE WITH INDUSTRIAL RESEARCH CENTER (IRCE) AT
  3. SUPERVISOR OF THE INVESTIGATION STUDY SOIL SEMBANKMENT FOR THE RAILWAY FROM TAJOURA DAFINIA WITH MERIT ENGINEERING OFFICE AS JOINT VENTURE WITH INDUSTRIAL RESEARCH CENTER (IRCE) AT .2003.
  4. SUPERVISOR THE GEOTECHNICAL STUDY OF ZONE 7 & ZONE 4 FOR RAMCO LIBYAN BRANCH , WITH MERIT CONSULTANCY 2008
  5. SUPERVISOR THE GEOTECHNICAL STUDY OF ZONE 16 FOR LIBYAN INVESTMENT COMPANY, WITH MERIT CONSULTANCY 2008
  6. GEOTECHNICAL STUDY FOR MOSQUE CONSTRUCTION IN AL FATAH UNIVERSITY FOR ARTS TURHESH COMPANY.-2008
  7. GEOTECHNICAL STUDY FOR BREDIG CONSTRUCTION IN TAURGA FOR J&P -2008
  8. GEOTECHNICAL INVESTIGATION  OF  POLICE  DEPARTMENT  IN JEDIDA  JAIL, -2009
  9. GEOTHECNICAL INVESTIGATION OFAL FLAH3 PROJECT FOR ALINMAA HOLDING COMPANY AT -2009.
  10. GEOTHECNICAL INVESTIGATION OF ALMANSOURA PROJECT FOR AL INMAA HOLDING COMPANY -2009.
  11. GEOTHECNICAL INVEATIGATION OF MATIGA ROAD PROJECT FOR AL INMAA HOLDING COMPANY -2009.
  12. GEOTHECNICAL INVESTIGATION OF WATER TANK OF MEZDAH AREA FOR TRIPOLI CONSTRUCTION COMPANY, 2009
  13. GEOTHECNICAL INVESTIGATION OF FOOTBALL STADIUM AT WADI AL RABIA FOR LIDCO
  14. GEOTHECNICAL INVESTIGATION OF FOOTBAL STADIUM OF ALKRIMIA AREA FOR LIDCO
  15. GEOTHECNICAL INVEATIGATION OF FOOTBAL STADIUM AT MUSRATH CITY FOR LIDCO -2010.
  16. GEOTHECNICAL INVESTIGATION OF HAITI INVESTIMENT BUILDING FOR AL INMAA HOLDING COMPANY-2010.
  17. COUNSOLTING SOIL TEAM IN 3TH GENRATION PLANINING WORK FOR SIRE GULF AREA 2005-2010 27,000,000.00 DL
  18. COUNSOLTING SOIL TEAM IN 3TH GENRATION PLANINING WORK FOR ESTREN PART OF LIBYA AREA 2005-2010 30,000,000.00 DL
  19. GEOTHECNICAL INVESTIGATION OF Administrative building to administrative control Tripoli CITY FOR Alamed Office Consulting Engineers 2021.
  20. GEOTHECNICAL INVESTIGATION OF Pedestrian bridges Alkoumes wadi kaam CITY FOR Misrurata public work 2021.
  21. GEOTHECNICAL INVESTIGATION OF PUMP STATION IN AIN ZARA –AL-FERNAJ FOR PWCT-STT JOINT VENTURE COMPANIES
  22. GEOTHECNICAL INVESTIGATION OF Public Hospital sooq algoma CITY FOR Alquabes 2021-2022.
  23. Consultation report on the review of the extracts of the Africa Tower Hotel project for Libyan United Company 2021-2022.
  24. Concrete mix design for Al-Ejtihad Co. for ready concrete.2022
  25. Concrete mix design for Tobacts General contracting & processing building Co. 2022
  26. Concrete mix design for Alomran Elsaree Co. for Contracting.2022
  27. Geothecnical Investigation of Bridge in Misrata in Medical School For Shaker Consultancy Group. 2023.
  28. Geothecnical Investigation of Bridge in Misrata in Heavy Traffic For Shaker Consultancy Group. 2023.
  29. Geothecnical Investigation of Bridge in Misrata in City Spotrs For Shaker Consultancy Group. 2023.
  30. Geothecnical Investigation of Bridge in Misrata in Agriculture School For Shaker Consultancy Group. 2023.
  31. Geothecnical Investigation of Construction of Al- Atay Hospital in Al-Qarabouli for Al-Emad international general constricting Co.
Al-Falah 2008
2March hai aleslami 2022
Soq aljouma Metiga 2009
Behind the university 2021
Alkhomes 2021
Ain Zara Tripoli 2022